| Name of project |
Berth 5#, 6/# in Shatian
Zone, Ist project of Humen Port, Dongguan city |
| Description
of project |
Berth 5#, 6/# in Shatian
Zone, Ist project of Humen Port, Dongguan city. Length
of port 450m(including prearr- anged length 160m),collocated
accor- ding to two 15000 DWT containers' berth. Its structure
is designed for 35000 DWT Container ship to berth. The
land area covers 483 thousand square meters(including
prearranged area),building area 21.479 thousand square
meters,loading area 88.395 thousand square meters,road
area 79.5 thousand square meters. Annual container handling
capacity 350 thousand TEU. |
| Cooperation
form |
Contractual joint venture
|
|
Intended duration of cooperation
(in years)
|
25 |
Total investments
(in ten-thousand USD) |
9800 |
| Chinese
contribution |
|
| Foreign
contribution |
9800 |
| Projected
time for reimbursement (in Year) |
9го44 |
| Project
site |
Xi Datan Management Zone,
Shatian town,Dongguan City. |
| Conditions
of Infrastructure |
Water, power, transportation
and
communication are facilitated. |
| Contact
person |
Wang Jiongquan, Li Guangming
Tel: 86-769-2814236,2813846,2650552
Fax: 86-769-2813750,2650553 |
| Description
of Chinese partner |
Name and Address:
Dongguan Humen Port Construction
Headquarters,
Add: 1 l/F, Lixin Transportation
Building,Dongchen District,
Dongguan city
|